Biogas plant with digester tanks and gas holder

Waste-to-Energy · Biogas

Biogas — renewable energy from organic waste.

Glorinda completes every phase of a biogas project — preliminary studies and feasibility, process and detailed design, project management and commissioning — and procures the digesters, tanks, agitators and filters it needs.

biogas plantanaerobic digestionanaerobic digester

Overview

Biogas — renewable energy from organic waste.

We are capable of completing all phases of a biogas project, starting with a feasibility study and calculation of costs and profitability, then process design and engineering, detailed design and plotting of tanks, pipes and components.

We also manage biogas projects from start to finish: construction management and supervision, performance and quality monitoring, process commissioning and operations monitoring. Glorinda procures biogas packages and equipment such as tanks, agitators, digesters and carbon filters — and pairs biogas with our AnaeroMBR for high-strength effluent.

End-to-endFeasibility to commissioning
AD packagesDigesters, agitators, filters
+AnaeroMBRBiogas from high-COD effluent
CHP-readyGas for power and heat

Typical applications

Where it fits

  • Agricultural & food waste to biogas
  • Sludge-derived biogas
  • Industrial organic effluent
  • Anaerobic digestion plants
  • Biogas upgrading & use
  • Combined heat & power from biogas

Common challenges

  • Organic waste with disposal cost and no value
  • Variable feedstock and process stability
  • High-strength effluent (see AnaeroMBR)
  • Getting from concept to operating plant

Glorinda’s answer

  • Full project delivery, feasibility to commissioning
  • Digester, agitator and filter packages
  • AnaeroMBR for high-COD streams
  • Operations and performance monitoring

Our approach

The feedstock decides the project

Biogas plants fail commercially far more often than they fail technically, and the cause is almost always feedstock: too little of it, too variable, or contracted on terms that do not survive the first year of operation. This is why our involvement starts with a feasibility study and a calculation of costs and profitability ratios before any process design begins.

Once the feedstock case holds, we complete every phase: process design and engineering, detailed design, plotting of generals, tanks, pipes and other components, construction management and supervision, monitoring and evaluation of implementation quality, process commissioning and operations monitoring. We also procure the equipment — biogas packages, tanks, agitators, digesters and carbon filters.

For high-strength industrial effluent, conventional digestion is often the wrong tool. Our AnaeroMBR combines a completely-mixed anaerobic reactor with low-energy tubular ultrafiltration membranes, tolerating COD loads above 250 g/L along with high TSS, FOG and salinity that would defeat a UASB or EGSB system — and recovering biogas from streams that would otherwise be a treatment cost.

  • 01

    Feasibility

    Technical and commercial feasibility, technology evaluation and cost/profitability analysis before capital is committed.

  • 02

    Engineering

    Conceptual, basic and detailed engineering, process packages and specification of the equipment that will actually be bought.

  • 03

    Delivery

    EPC or EPCM delivery, or an Owner’s Engineer role protecting your interest through a contractor’s execution.

  • 04

    Commissioning

    Installation supervision, testing, start-up and the training that lets your team run the plant.

  • 05

    Support

    Operation, troubleshooting, process optimisation, maintenance and spare parts for the life of the asset.

FAQ

Good to know

Do you deliver the whole biogas plant?

Yes — from feasibility and process design through detailed engineering, construction management, commissioning and operations monitoring, plus procurement of digesters, agitators, tanks and filters.

Can you get biogas from difficult effluent?

Yes. Our AnaeroMBR combines anaerobic digestion with UF membranes to recover biogas from high-COD, high-FOG or salty wastewater that defeats conventional digesters.

Build a biogas project with us.

Tell us your feedstock and site and we will scope a biogas plant from feasibility to commissioning.